Project controls managerSalary, qualifications, career path and hiring demand, 2026 edition

A nuclear project controls manager owns the project performance picture: project schedules, project budgets, forecast, risk management, change, earned value and reporting. They lead planners, cost engineers, risk specialists and analysts, turning separate inputs into one defensible baseline and forecast. Unlike the project manager, they do not own project scope. Their value is independent control: showing what the project is really doing, what changed and where senior leadership action is required.

Cost · Schedule · RiskEVMS · ChangePerformance assuranceHigh hiring demand
In short

Exact-title national salary data does not exist, so TRX models the 2026 market from live nuclear controls roles. Ameren publishes $131,900–$204,400 for Manager, Nuclear Project Controls; Westinghouse Senior Project Controls Manager sits around $126,000–$157,500. In the UK, Sizewell C advertises circa £90,000, with senior nuclear controls scopes reaching £100,000–£120,000.

There is no nuclear project-controls licence. The gate is evidence that you can protect an integrated baseline, forecast cost and completion honestly, explain variance, control change and run risk / reporting processes that survive scrutiny. P6, EVM / EVMS, cost systems and data capability are common filters; AACE, PMI or APM credentials help.

Ameren Manager, Nuclear Project Controls published US base range, 2026
$0–$204,400
Westinghouse Senior Project Controls Manager published US range, 2026
$0–$157,500
current Sizewell C Project Controls Manager advertised UK salary, 2026
£0
2026 UK Project Controls Manager contractor benchmark outside IR35
£0–£900/day
Role snapshot

The role at a glance

Everything an employer will ask about in the first fifteen minutes of a screening call.

Project Controls Manager Vacancies
Also called
project controls manager · programme controls manager · controls lead · integrated controls manager · project services manager · PMO controls manager
Entry qualification
Bachelor's degree or equivalent experience in engineering, construction, project management, quantity surveying, finance, business or a related field. Most managers arrive after years in planning, cost, risk or integrated controls.
Typical entry pay
$80,000–$110,000 US at specialist / developing-lead level · £55,000–£72,000 UK before full controls-management scope.
Senior pay
$145,000–$205,000 for US senior controls management, with heads above · £100,000–£155,000 for UK deputy programme controls through head / director.
Contract day rates
£650–£900/day Project Controls Manager · £900–£1,300/day Head / Controls Director outside IR35; nuclear and defence normally sit at the premium end.
Professional gate
No universal licence. AACE PSP / CCP / EVP, PMP, APM PMQ or ChPP strengthen credibility, but baseline ownership, P6 depth, cost forecasting and risk / change evidence decide the shortlist.
Security
UK BPSS common and SC role-specific. US commercial work can require unescorted access / fitness-for-duty; DOE or national-security work may require citizenship and Q-level clearance.
Where the work sits
Owner PMOs, reactor vendors, EPC / architect-engineers, Tier 1 contractors, operating utilities, decommissioning alliances and advanced-reactor developers. Managers usually lead a controls department team across one major project or programme area.
Travel
Usually moderate. Hybrid PMO work is common, but baseline reviews, supplier assurance, site integration, outage periods and recovery work increase travel and site presence.
TRX segments
Large new build · New technology development · Operating fleet · Fuel handling & fuel cycle · Decommissioning & dismantling · Radioactive waste management · Nuclear medicine · Dental
What the job is

Six versions of the same job title

"Project controls manager" changes with delivery model and lifecycle. The same title can mean new-build controls, outage controls, decommissioning assurance or portfolio PMO; the common thread is ownership of the performance baseline. Bar shows relative hiring volume across TRX's 2026 desk activity.

Large new build / programme controls

Lead integrated cost, schedule, risk, change and reporting across a major civils, nuclear-island, MEH or balance-of-plant scope.

ROLESProject controls manager · programme controls manager · integrated controls lead

Operating fleet / outage controls

Control modifications, outage work, resource loading and forecast-to-complete against fixed plant windows.

ROLESOutage controls manager · project controls manager · planning and cost manager

Decommissioning and remediation

Run controls across retrieval, dismantling, waste and infrastructure packages where uncertainty, NEC change and risk drawdown shape the forecast.

ROLESProject controls manager · programme controls lead

SMR / advanced-reactor FOAK

Build controls maturity while design, licensing, supply chain and construction evolve together.

ROLESProject controls manager · PMO controls lead · integrated planning manager

EPC / vendor delivery

Control customer contracts and equipment packages across WBS, schedule, cost, cash, milestones and supplier interfaces.

ROLESProject controls manager · project services manager

Portfolio / enterprise PMO assurance

Set standards, tools, dashboards and assurance across projects, challenge forecasts and consolidate executive performance.

ROLESPortfolio controls manager · PMO controls manager
A working day

What the week actually looks like

A composite day for a project controls manager on a major nuclear programme, leading planning, cost, risk and reporting resources. The function must be independent enough to challenge delivery teams but close enough to understand the causes behind variance.

Programme controls · typical TuesdayIntegrated PMO, cost, schedule, risk interfaces
08:00
Controls dashboard and data qualityReview schedule updates, cost postings, change logs, risk movements and data exceptions. Separate genuine forecast movement from coding, progress or cut-off errors.
09:00
Schedule integrationChallenge critical path, logic, constraints and interfaces in P6. Test whether supplier, design, construction and commissioning dates reconcile.
10:30
Cost / forecast reviewWalk budget, commitments, actuals, accruals, EAC and contingency with cost leads. Investigate variance at source and separate productivity loss from timing or scope change.
12:00
Risk and change integrationReview high-impact threats and change requests with cost / schedule consequences. Confirm approved change enters the baseline once, with ownership and audit trail intact.
13:30
Performance meetingPresent performance, milestone confidence, trend, QRA exposure and forecast movement to project leadership. The value is explaining what management decision the data requires.
15:00
Recovery / scenario workModel options for a late design package, supplier delay or access constraint, comparing resequencing, extra resource and mitigation cost against completion confidence.
16:30
Baseline governanceClose approved changes, audit schedule / cost alignment and coach the team on weak evidence. A credible month-end starts before cut-off; narrative cannot repair bad numbers afterwards.
Controls gets hardest when the project needs good news. During recovery, commissioning or an outage, pressure to move dates, rebaseline or soften risk increases. A strong controls manager separates approved change from forecast miss and refuses to make the baseline look healthy by moving the measurement point.
Pay, 2026

What nuclear project controls managers are paid in 2026

There is no official wage series for "project controls manager" in nuclear. The ladders below are a TRX market model anchored to live 2026 Ameren, Westinghouse, Sizewell C, Assystem and Hinkley Point C roles, UK project-controls contractor benchmarks and broader BLS project-management data. Base salary only; bonus, per diem and site allowances are excluded.

Base salary by level · TRX market model anchored to BLS project-management data and live nuclear controls postings
$0$65k$130k$195k$260k
Project controls specialist / developing lead3–6 yrs
$95k
Senior project controls specialist5–8 yrs
$118k
Project controls manager8–12 yrs
$145k
Senior project controls manager10–15 yrs
$175k
Head / director of project controls12+ yrs
$210k
25th–90th percentileMedianTRX market analysis, Q3 2026

How project controls management compares to adjacent roles

Official BLS occupation data are broader anchors; the nuclear controls row is a TRX model because the exact specialism is not separately coded.

OccupationMedianP10P90What moves the number
Project controls manager, nuclear (TRX model)$145,000$80,000$205,000Integrated controls scope, nuclear delivery, EVMS / QRA, recovery and team span
Project management specialists (all industries)$102,320$61,580$167,970Industry, project complexity, seniority and management responsibility
Architectural and engineering managers (all industries)$171,270$120,810$262,760Technical organisation size, sector and management accountability
Cost estimators (all industries)$78,740$48,530$130,820Industry, major-project complexity, estimating depth and responsibility

Sources: live 2026 nuclear controls postings from Ameren, Westinghouse and UK new-build employers; BLS May 2025 coded occupations used as broader anchors. Employer ranges are job-specific, not national percentiles.

Premium 01

EVMS / baseline assurance and integrated baseline reviews (IBR)

Professionals who can establish a robust and defensible performance measurement baseline, lead integrated baseline reviews, and clearly explain schedule and cost variance without manipulating data are highly sought after in large US and government-facing nuclear and energy transition programmes.

Premium 02

Quantitative risk analysis (QRA) and integrated cost-schedule risk management

Expertise in probabilistic risk assessment and integrated cost-schedule risk analysis adds significant value, as executive boards require data-driven, probability-based completion forecasts and contingency planning rather than qualitative risk registers. Experience in nuclear, defence, and clean energy sectors commands a premium.

Premium 03

Project recovery and FOAK (First of a Kind) delivery

Project controls managers with proven success in diagnosing failing baselines, rebuilding forecast credibility, and leading recovery efforts on new build nuclear plants, advanced reactors, or commissioning projects are in high demand and command top-tier compensation compared to steady-state project controls roles.

Routes in

Three ways in, and only one of them starts with a controls degree

The role is normally reached through planning, cost / commercial controls or broader project delivery. The move into management happens when you can integrate disciplines and defend one project truth, not simply become the most senior P6 user.

Route A

Planning / scheduling to integrated controls

The classic route. Ten or more years to head / programme controls.

Year 0–3Planner / schedulerBuild WBS, logic, calendars, critical path and progress discipline in Primavera P6 or equivalent project controls processes tools.
Year 3–6Senior planner / planning leadOwn contractor integration, schedule assurance, forecasting, change and recovery while coordinating with the project team.
Year 5–8Add cost, risk and reportingLearn EAC, earned value, QRA, accounting principles, and how schedule decisions move cash and contingency.
Year 7–10Project controls managerLead planning, cost, risk and reporting resources and own the integrated month-end position on assigned projects.
Year 10+Head / programme controlsSet standards across projects, maintain baselines, assure baselines and brief executive governance with a focus on company strategy.
Route B

Cost / commercial controls

Strong where contracts and change drive exposure. Four steps to controls manager.

Step 1Cost engineer / quantity surveyorBuild estimate, budget, commitment, accrual, forecast and earned-progress depth in compliance with accounting principles.
Step 2Senior cost / change leadOwn trends, change, compensation events, contingency and commercial interfaces while providing guidance to the project team.
Step 3Add schedule / risk integrationBuild credibility on logic, critical path, QRA and the timing behind cost movement to evaluate project aspects.
Step 4Controls managerLead the integrated function so cost, schedule, risk and change tell one story and execute project controls processes effectively.
Route C

Project engineering / PMO / analytics transfer

Best when paired with controls depth. Ten or more years to programme / portfolio controls leadership.

Year 0–3Project engineer / analystLearn delivery interfaces, reporting cadence and how technical progress is evidenced within the workplace.
Year 3–6PMO / controls leadOwn dashboards, WBS / CBS alignment, change or integrated reporting for a significant scope, maintaining efficiency.
Year 5–8Build technical controls depthGain P6, forecasting, EVM, risk competence and safety practices; reporting alone is not enough.
Year 7–10Project controls managerLead multidisciplinary controls and challenge project leadership with evidence, coordinating with employees.
Year 10+Programme / portfolio controls leadershipMove from one baseline to enterprise standards, assurance and executive performance, with training and vision for future operations.
Before you apply

Are you actually ready to compete for a project controls manager role?

A controls CV must prove more than "P6 and reporting". Show baseline value and complexity, schedules / packages integrated, budget controlled, forecast or QRA responsibility, changes governed and decisions your analysis triggered. The shortlist wants evidence that leadership trusted your numbers under pressure.

Free resume scoring on avua, TRX's job search and application platform. Your score is yours; it is not shared with employers.
Example scorecardIllustrative
68out of 100

Strong CVs quantify baseline size, forecast responsibility, team span and the recovery or decision outcome. Weak ones list systems without showing how the data changed delivery.

A typical senior planner / cost-lead CV
68
Average of shortlisted candidates
79
Top decile for project controls manager roles
91

Illustrative figures based on TRX shortlisting patterns only. Your own score is generated by avua from your CV and the role you are targeting.

Gates

The credentials that actually gate the work

Project controls management is gated by proven competence in baseline, schedule, cost, risk and change plus programme-specific access requirements. Professional credentials strengthen the case; none is a universal nuclear licence.

CredentialJurisdictionRequired forTimeNotes
Relevant degree or equivalent controls experienceAllMost management appointments3–4 yrs / experience-basedEngineering, construction, finance, quantity surveying, project management or equivalent analytical route.
Primavera P6 / enterprise scheduling competenceGlobalMost major-project controls rolesExperience-basedManager must understand logic and schedule quality even when a planning lead owns the file.
AACE PSP / CCP / EVPGlobalSpecialist credibilityMonths + experienceUseful for planning, cost and earned-value pathways; not mandatory on every role.
PMP / APM PMQ / ChPPUS / UK / GlobalBroader project-profession signalMonths / experience-basedHelpful for governance and leadership credibility; not a nuclear licence.
EVMS / ANSI-EIA-748 knowledgeUS / selected programmesEVM-governed workExperience-basedImportant on federal, DOE, defence and mature earned-value environments.
NEC4 / major-contract controls knowledgeUKNew build / decommissioning / infrastructureExperience-basedAccepted Programme, change and compensation-event interfaces can be central to controls.
BPSS / SCUKSite / sensitive programmesDays–monthsBPSS common; SC applies where the assignment requires it.
Unescorted access / DOE Q or citizenship conditionsUSCommercial site or national-security workSite-specificRequirements vary materially between commercial nuclear and DOE / defence programmes.

Requirements vary by employer and jurisdiction. AACE / PMI / APM credentials are professional signals; EVMS, NEC, security and site-access requirements apply only where the delivery model or programme calls for them.

Skills screened

What appears on a 2026 project controls manager shortlist

Recruiters screen for the ability to make cost, schedule, risk, change and progress reconcile into one defensible forecast, then communicate the consequence clearly enough for leadership to act. Ordered by how often a hiring manager treats it as a hard filter rather than a nice-to-have.

Hard filters

Named on the specification

  • Integrated scheduling — Primavera P6, WBS, logic, critical path, constraints, resource / milestone integration and schedule health
  • Cost and forecast control — Budgets, commitments, actuals, accruals, ETC / EAC, contingency and ERP integration
  • Earned value / performance measurement — EVMS, progress rules, CPI / SPI, variance analysis and baseline integrity where the programme uses EVM
  • Risk and opportunity — Quantitative / qualitative registers, QRA, Monte Carlo outputs, mitigation and contingency linkage
  • Change control — Trend logs, scope / schedule / cost impact, approval routes, baseline update and audit trail
  • Data and reporting — Power BI, Excel, data validation, dashboards and single-source-of-truth discipline across controls systems
  • WBS / CBS / coding structures — Alignment across engineering, procurement, construction, contracts, cost and schedule
  • Governance and assurance — Reporting calendars, baseline reviews, forecast challenge, executive packs and independent controls judgement
Differentiators

What decides between two shortlisted candidates

  • Integrated baseline review / EVMS assurance — Proving the baseline is executable and compliant rather than simply loaded into a tool
  • QRA / integrated cost-schedule risk — Translating uncertainty into probability-based dates, contingency and decisions
  • Project recovery — Rebuilding schedule and forecast credibility after slippage, scope shock or supplier failure
  • FOAK / megaproject controls — New build, advanced reactors or major decommissioning where design maturity and interfaces move continuously
  • Contract-framework depth — NEC4, EPC / EPCM or major supplier contracts, with controls evidence that supports change and entitlement
  • Digital controls integration — Connecting P6, cost, risk and BI environments so management information is traceable rather than manually reconciled
One thing candidates consistently underweight. The most valuable controls manager can say "the forecast is wrong." Interviews test whether you can challenge leadership when the preferred story is more optimistic than the data. The strong answer is traceability: what moved, why, which assumption is unsupported and what decision follows. Independence is part of the job.
Where the jobs are

The 2026 demand map

Project-controls demand tracks capital intensity and interface count. New build, FOAK reactors, restarts, decommissioning and large modification portfolios all need credible schedule, cost, risk and change integration before leadership can make reliable decisions.

ProgrammeLocationPhase in 2026Engineering demand
Sizewell CSuffolk / London, UKMajor construction mobilisation and programme controls build-outVery high; integrated cost, schedule, risk, reporting and supply-chain controls
Hinkley Point CSomerset, UKLate construction, MEH installation, fit-out and commissioning preparationVery high; package controls, planning, cost, change and completion forecasting
Sellafield / Programme and Project PartnersCumbria, UKLong-term remediation and major-project deliveryVery high; programme controls, commercial integration, estimating, schedule and risk
Rolls-Royce SMR / WylfaNorth Wales, UKThree-unit delivery contract; site-specific design and long-lead procurementHigh; FOAK baseline, supplier, design maturity and portfolio controls
OPG / BWRX-300 DarlingtonOntario, CanadaNuclear construction under way; operating-licence application submittedVery high; construction controls, schedule integration, cost, risk and commissioning planning
TerraPower NatriumWyoming, USConstruction permit issued; nuclear construction started in 2026High; FOAK cost / schedule integration, supplier progress and risk
Kairos Power Hermes 2Tennessee, USGroundbreaking completed April 2026; commercial-scale demonstration deliveryHigh; advanced-reactor planning, construction controls and iterative programme reporting
Ameren Callaway / operating fleetMissouri, USOperating plant capital, outage and modification portfolioHigh; nuclear project controls, outage planning, forecasting and portfolio governance
Westinghouse nuclear services / new plant deliveryUS & globalOperating-fleet, outage, equipment and new-build project deliveryHigh; customer controls, cost, schedule, change and project-services leadership
US restart / uprate programmesUnited StatesRestart, life-extension and capacity-investment programmes activeHigh; integrated baselines, licensing-linked schedules, risk and recovery controls

Programme phases move. The table reflects public status verified in September 2026; candidates should confirm current construction, licensing and contracting positions before making a relocation or contract decision.

Read the market this way

Controls is becoming more integrated, not less

Sizewell C, Hinkley Point C, Sellafield, Darlington and Natrium create huge interface and change exposure. Employers are moving from isolated planning or cost silos toward integrated controls, digital reporting and probabilistic risk. Candidates who join those disciplines are portable across nuclear technologies.

The scarcity

People who can defend the forecast

Planners and cost engineers are available; managers who can reconcile schedule, cost, risk and change, challenge senior stakeholders and keep the baseline auditable through difficult delivery are not. Nuclear adds another filter: controls decisions must respect quality, licensing and configuration constraints.

Where it leads

Adjacent and onward roles

Project controls sits between delivery, commercial, data and programme leadership. These are the closest sibling and progression routes.

Senior planner / planning managerDeep schedule specialism, critical-path ownership and contractor schedule assurance.
Cost engineering managerBudget, estimate, forecast and cost-control leadership with less schedule / risk breadth.
Risk manager (nuclear)Qualitative and quantitative risk ownership, QRA and decision support.
Nuclear project managerOwns delivery scope and decisions; consumes controls information rather than independently assuring it.
Nuclear programme managerIntegrates several projects and benefits, using controls as the core management-information system.
Head of project controlsLeads controls standards, assurance, systems and senior teams across programmes or portfolios.
Questions

Questions we get asked every week

How much does a nuclear project controls manager earn in 2026?

There is no exact national series. TRX models US manager-level base pay at $125,000–$165,000, rising to $145,000–$205,000 for senior project controls managers; Ameren publishes $131,900–$204,400.

In the UK, established project controls managers sit around £72,000–£92,000, with Sizewell C at circa £90,000 and senior programme-controls scopes reaching £100,000–£120,000.

Do you need Primavera P6 to become a project controls manager?

On major capital projects in nuclear, Primavera P6 is a common hard filter because the integrated schedule drives forecasting and interfaces across cross-functional teams.

But P6 alone is not enough: project controls manager roles also require cost, risk, change, reporting, communication and governance skills. A strong scheduler who cannot explain earned value management, EAC or change control remains a planning specialist.

Which certifications matter most for project controls?

AACE PSP, CCP and EVP are directly relevant; PMP, APM PMQ and ChPP are broader project-profession signals. None is a legal nuclear licence.

Employers still prioritize evidence that you owned a real baseline, passed integrated baseline assurance, and supported decisions under scrutiny.

What is the difference between a project controls manager and a project manager?

The project manager owns delivery scope, project deliverables, suppliers, budget and acceptance.

The project controls manager owns the integrity of the performance system measuring and forecasting that delivery: schedule, cost, risk, change, critical path analysis and reporting. The strongest relationship is constructive tension.

Is project controls management a good nuclear career in 2026?

Yes. Sizewell C, Hinkley Point C, Sellafield, Darlington BWRX-300, Natrium, Wylfa SMRs and fleet investment all need project controls managers at scale.

The skillset also transfers well into defence and major infrastructure, especially with both P6 and cost / risk integration.

Which project-controls skills are most in demand in 2026?

Integrated schedule-cost forecasting, EVMS / baseline assurance, QRA, change control, communication and digital reporting are the strongest filters.

FOAK delivery, NEC / major-contract knowledge, recovery and the ability to defend an uncomfortable forecast are senior-level differentiators.

Nuclear only

We only recruit in nuclear. That is the whole point.

TRX works across large new build, fusion, new technology development, operating fleet, decommissioning, radioactive waste management and nuclear medicine, in 14+ countries. Send us your CV and we will tell you honestly whether your experience fits planning, cost, risk, integrated project controls, project management, PMO leadership or head-of-controls work, and what it is worth.